| |
|
|
|
KASHIPUR
|
|
|
|
- Lighting division and factory building construction began
|
|
|
|
- GLS chain started production
- First chain of FTL
started production
- Surya tubes and bulbs launched in the market
|
|
|
- Second chain of FTL
started production
- Modern glass factory
began production
|
|

|
- Second GLS lamp chain started production
|
|
|
- Bulb blowing machine
added to production
|
|
|
-HPSVL and Energy-Efficient 26mm FTL production began
|
|
|
- Tube drawing capacity expanded
|
|
|
|
- Production of Fluorescent powder, Filament for GLS and FTL began.
- Two more GLS shell blowing machines started production
|
|
 |
|
|
- New modern lead glass plant started production
-GLS lamp production capacity increased
|
|
 |
|
|
- GLS lamp production
capacity doubled |
|
 |
|
|
- Filament and wire
drawing capacity
increased
- New automatic
packing machine for
FTL introduced |
|
 |
|
|
- FTL capacity increased
by addition of a new FTL chain
|
|
 |
|
|
|
|
 |
|
|
-Blended lamps and Blue Tubes developed
-ISO 14001 and OHSAS 18001 certifications received for safety & environment
|
|
 |
|
|
-Production capacity of HID lamps increased from 1.5 lac Pcs. p.a. to 4.5 lacs Pcs. p.a.
|
|
 |
|
|
-Additional tube Drawing Line installed in lead glass Furnace doubling the production capacity
-Additional tube Drawing Line on sodalime Furnace installed.Production capacity of tubular shells increased by 50%
-New FTL chain installed from GE (Hungary)
|
|
 |
|
|
-Capacity of wire drawing & filament plant enhanced by 90 million filaments p.a.
|
|
 |
|
|
|
|
|
|
|
|
- Production of 5 million FTLs and 20 million GLS started |
|
 |
|
|
|
- FTL capacity expanded
to 10 million
|
|
|
|
|
- Production of H4-
Halogen Lamps
started
|
|
|
|
|
- Production of H3
Lamps started
- Production of Deco Lamps started
|
|

|
|
|
- High Speed Falma started for GLS lamp manufacturing with speed 3500 Pcs per Hr.
Aluminium cap plant for GLS started
|
|

|
|
|
- FTL automatic packaging machine started
New Osram GLS chain started
|
|

|
|
|
|
- Asia's largest ribbon glass plant startedwith annual capacity of 400 million GLS and 25 million FTL shell
|
|
 |
|
|
- 14" Danner machine started increasing capacity of FTL shell to 35 million p.a.
|
|

|
|
|
- Automatic Unit Carton Packaging machine for GLS started
|
|

|
|
|
- Second high speed falma chain installed with speed 4000 Pcs Per Hr.
|
|

|
|
|
- Third line of FTL installed.
New fully Automatic FTL Packaging machine installed.
|
|

|
|
Top |